top of page
IMG_5599.HEIC
Before    
IMG_5847.HEIC
After
Complete kitchen renovation including demo of partial wall, electrical/ plumbing upgrades, ceramic tile floor, cabinets from Dlux, quartz countertop and backspash
IMG_6088.HEIC
Before    
IMG_6521.HEIC
After
Top to bottom house renovation including plumbing/ electrical upgrades, insulation/ drywall, refinishing hardwood floors throughout, IKEA kitchen cabinets, quartz countertop with backsplash feature wall
​
IMG_6533.HEIC
IMG_6216.HEIC
Before    
IMG_6699.HEIC
IMG_6624.HEIC
After
Complete kitchen renovation including partial wall removal and reconfiguration, plumbing/ electrical upgrades, flooring, cabinets by Two30Nine, quartz countertop and herringbone subway backsplash 
IMG_5983.HEIC
IMG_6170.HEIC
Before    
After
12'x14' addition opened up creating a open dining/ family room area. New hardwood flooring, windows and patio door, electrical and Hvac upgrades. This was the 1st phase of the project, also included a kitchen and bathroom upgrade
IMG_6792.HEIC
IMG_7054.HEIC
Before    
After
2nd phase of the project including chimney removal, creating passthrough in wall, electrical/ plumbing upgrades, hardwood flooring, IKEA cabinets, quartz countertop with glass tile backsplash
IMG_7114.HEIC
Before    
IMG_7208.HEIC
After
Phase 3 included replacing insulation/ drywall, electrical/ plumbing upgrades, vinyl plank floor, bathtub w/ 1pc wall surround, toilet/ vanity and subway tile feature wall 
IMG_4916.HEIC
IMG_5227.HEIC
Before    
After
Complete garage build including demo, concrete, framing, electrical, roofing, soffit/ fascia, stucco, windows and doors
IMG_7046.HEIC
Before    
IMG_7093.HEIC
After
Rebuilding the back staircase to match the time period, including plaster patching, framing/ drywall, painting and staining
IMG_4986.HEIC
IMG_4987.HEIC
Before    
IMG_7358.JPG
After
Kitchen renovation including closet/ popcorn ceiling removal, electrical/ plumbing upgrades, vinyl flooring, Kitchen Craft cabinets, quartz countertops and subway tile backsplash
IMG_7219.JPG
Before    
IMG_7228.HEIC
After
Master bedroom upgrade including framing/ drywall modification, hardwood floor patch and refinish, custom bulkhead w/ crown molding, finished carpentry w/ double French doors and closet organizers
IMG_5576.HEIC
Before    
IMG_6029.HEIC
After
Reconfigured main floor plan including 2 bedrooms, bathroom, mudroom and foyer. New wainscoting, crown molding, hardwood floor patching and custom mirror
​
bottom of page